Sign In | Join Free | My gimpguru.org |
|
Brand Name : GT
Model Number : Metal Stamping Mold
Certification : CE / ISO9001
Place of Origin : Dongguan China
MOQ : 1 mold
Price : Negotiate
Payment Terms : T/T, L/C, Western Union
Supply Ability : 65 molds / month
Delivery Time : 20 days after 2D 3D confirmed
Packaging Details : Woodencase for packaging mold & Carton Box for packaging products
Mold Base : LKM C50 + P20 for AB , Cast iron etc
Product Material : Aluminium , ADC12 , ADC14 , A360 , A380 , AlSi9Cu3 and so on
Shape & Color : Can be design according to your needs
Model : Sheet metal stamping molds tool and die makers
Item name : Metal Stamping Mold
Certificated : ISO 9001:2015 Certificated
Shaping Mode : Die Casting
Mold Treatment : Heat Treatment >HRC45
Trade information:
MOQ | 1 set |
Mold lead time | T1 sample, about 3-10 weeks, according to the mold requirement |
Production lead time | 2-5 weeks, according to the order Qty |
Mold payment term | 50% T/T deposit with PO, balance 50% T/T after sample approved |
Products payment term | 30% T/T deposit with PO, balance 70% T/T before shipment |
Port of loading | Shenzhen |
Services | CNC Machining |
Sheet Metal Fabrication | |
Mould | |
Laser Cutting Service | |
Steel Bracket | |
Stamping Parts | |
Material | *Aluminum |
*Steel,Stainless Steel | |
*Copper,Brass | |
*Die Casting | |
Finished | Sandblasting, Anodizing Color, Blackenning, ZincNickl Plating, Polishing And Brushing,Etc. |
Main Equipment | CNC Machining Center(Milling), CNC Lathe, Griantry CNC Machining Center,Etc. |
CNC Machining Center(Milling), CNC Lathe, Griantry CNC Machining Center,Etc. | |
Tube Laser Cutting Machine,Flame Cutting Machine,Robert Welding Arm,Etc. | |
Bending Machine,Stamping Machine,Sand Blasting Machine,Powder Coating Line | |
Drawing Format | Step,Stp,Gis,Cad,Pdf,Dwg,Dxf Etc Or Samples. |
Delivery Time | 5-30Days Depends On Quantities |
QC | ROSH, CE, ISO |
Tolerance | +/-0.02mm ~ +/-0.05mm |
Surface Roughness | Ra 0.6-3.2 |
Trade information:
MOQ | 1 set |
Mold lead time | T1 sample, about 3-10 weeks, according to the mold requirement |
Production lead time | 2-5 weeks, according to the order Qty |
Mold payment term | 50% T/T deposit with PO, balance 50% T/T after sample approved |
Products payment term | 30% T/T deposit with PO, balance 70% T/T before shipment |
Port of loading | Ningbo or Shanghai port |
Competitive Advantage:
1. We keep long term cooperation with some world Top Brand on electronic product area, such Epson,
Canon and Sony.
2. We have successfully gained the quality certificate of ISO 9001 and IGS.
3. We can design and manufacture the mould in different specification and standard, such as DME,HASCO
and DAIDO.
4. The factory is well equiped with the most advanced testing instrument, it is effective to ensure the precision
of the mould.
5. Strict quality control;
6. Good After-sale service;
7. On time delivery
![]() |
OEM LKM C50 ISO9001 2015 Aluminum Casting Molds Images |